When Duncan Li heard this, he couldn’t help but exclaim: “It’s reasonable and convincing. So, if you are asked to base your judgment on Skyline’s data, can you determine the target?”
Ai quickly replied: “By analyzing Skyline’s data, I think Kansel Oil is the most suspicious.
There is a solid roofed building of about 2,300 square meters in the north-central position of their oil field in It is not in the data from fifteen years ago, and construction began thirteen years ago.”
As he spoke, the AI displayed multiple images on the screen. The center of the first image was still an open space with vehicles and equipment scattered around.
In the second image, the foundation is laid on site and the wall is being built. At the same time, a trench is visible that extends from the inside of the foundation to the nearest oil extraction machine.
Ai continued: “From the second picture, it looks like there is a pipeline project under construction. The oil pipeline is connected to a nearby oil production machine. I think it should be an oil pipeline.
All the oil pipes in the oil field are Only this part of the oil pipe is buried underground. It seems that the other party does not want this part of the pipe to be exposed.
Therefore, there must be an oil generator inside the building, and the largest one should be a gas turbine.
Duncan Li said: “If you only rely on oil pipes to determine that it must be oil-fired power generation equipment, it seems that it is not enough.”
Ai said: “I expected you to say that, so I also learned that Nigeria Power Holdings Limited issued an announcement thirteen years ago.
Due to the shortage of electricity supply in Lagos and its environs at that time, the company decided to do so. Companies with serious electricity wastage in various places have implemented electricity rationing measures. Kansel Petroleum is among the list of companies with electricity rationing;”
“The announcement stated that the reason for the power reduction at Kessel was due to aging equipment, the power consumption of the Kanser Petroleum unit exceeds that of its peers.
However, the announcement was made two months earlier than the start of construction of the building.
According to my analysis, the construction of this building began immediately after the Petroleum Office experienced a power outage.
Since then, Kansel Petroleum has never suffered a similar punishment, so this building must be just a small oil-fired power plant!”